Silwatech is backed by a team of 1000+ employees, serving clients in over 10+ industries across 9+ locations
The end client is an engineering organisation operating within the construction sector. Its teams prepare electrical quantity takeoffs and cost estimates from technical construction drawings.
The organisation required a reliable method for identifying and counting electrical symbols across dense drawing sets without the time demands and error risks associated with manual tallying.
The end client’s identity is withheld due to contractual confidentiality and NDA obligations.
The project involved the development of an AI-powered electrical-symbol detection and automated takeoff system.
The solution was designed and developed by a SilwaTech partner company through SilwaTech’s partner delivery ecosystem.
The system covered
The solution was designed to automate repetitive counting while preserving engineer authority over final takeoff figures and cost-estimation inputs.
Key challenges included
The client needed an AI-assisted system capable of detecting, classifying and counting symbols while allowing qualified engineers to review and approve the final quantities.

Computer Vision Symbol Detection
A deep-learning detection model was developed to identify electrical symbols across complex construction drawings.
Key capabilities included
Legend Interpretation and Classification
OCR and classification capabilities were introduced to connect detected symbols with the corresponding drawing legend.
The solution provided
Engineer Review and Correction
A human-in-the-loop review interface allowed qualified engineers to validate AI-generated results.
Capabilities included
Takeoff and Estimation Integration
Approved quantities were converted into structured outputs for existing estimating workflows.
The solution supported
The technology environment included
The project was delivered through SilwaTech’s partner ecosystem under a partner-led implementation model.
The solution architecture, AI model development, OCR integration, review-tool development, testing and technical implementation were performed by an experienced SilwaTech partner company. SilwaTech contributed through engagement alignment, partner collaboration and coordination of the required computer vision and construction-technology capabilities.
The cross-functional delivery team included specialists in
Delivery progressed through four stages
The identities of the end client and implementation partner remain confidential. SilwaTech does not represent itself as the direct contracting party or sole technical implementer for this engagement.
Construction drawings and cost-estimation information represented commercially sensitive project data.
Key areas of focus included
These controls protected sensitive engineering information and retained accountability for final estimates with qualified professionals.
The reported outcomes included
The reported performance figures should be presented as project results and not as universal accuracy or processing guarantees across every drawing type.
Our project experience spans government authorities, regulated enterprises, and major organisations across multiple industries.
References shown may include direct SilwaTech engagements and work delivered through our contracted partner network. Inclusion does not imply a direct contractual relationship with, or endorsement of, SilwaTech.


























Engage with our enterprise team to discuss your digital transformation goals, platform modernization initiatives, or large-scale system requirements. We’re ready to support your next strategic technology move.